Solar Energy A member of the EDIG group
  English   |  עברית   |
Solar Energy
Contact

PHOTO GALLERY

Photos showing a timeline from beginning of construction until completion of Unit #1 in Kibbutz Samar.

 

FEBRUARY 2009

  30m high solar tower designed by Haim Dotan Ltd. Architects.

  Samar Field in its natural settings.

  Tower setup infront of Heliostat field.

MARCH 2009

 Heliostat field growing in the desert

 Aora's first 100kW module with tower and field of mirrors

 Israel's president, Shimon Peres, visiting Aora's solar power station

JUNE 2009 

 Solar tower in operation

 Solar tower in operation

 A room with a view: A tower top view at sunset over Samar and onto Jordan.

  Aerial photo showing Unit #1 in Kibbutz Samar.

 

JUNE 2009- LAUNCH EVENT

 Launch event in Kibbutz Samar, 24 June 2009
- Photo taken with a wide angle lens- the tower is upright.

  Photo of our Launch Event from inside the heliostat field 

 

 

Print Version Print Version       Send to a friend Send to a friend      
 
   

Designed by: עיצוב גרפי|בניית אתרים|הפקות דפוס