PHOTO GALLERY
Photos showing a timeline from beginning of construction until completion of Unit #1 in Kibbutz Samar.
FEBRUARY 2009
30m high solar tower designed by Haim Dotan Ltd. Architects.
Samar Field in its natural settings.
Tower setup infront of Heliostat field.
MARCH 2009
Heliostat field growing in the desert
Aora's first 100kW module with tower and field of mirrors
Israel's president, Shimon Peres, visiting Aora's solar power station
JUNE 2009
Solar tower in operation
Solar tower in operation
A room with a view: A tower top view at sunset over Samar and onto Jordan.
Aerial photo showing Unit #1 in Kibbutz Samar.
JUNE 2009- LAUNCH EVENT
Launch event in Kibbutz Samar, 24 June 2009
- Photo taken with a wide angle lens- the tower is upright.
Photo of our Launch Event from inside the heliostat field
|